Two Tired
Well, I hope the second new tire will be covered under warranty otherwise it will be an expensive first long trip with the Castaway.
There was no doubt that parts of the I-75 in Michigan were in horrible condition and it could well have been a pothole that caused the sidewall bulge. Whatever the cause, we had no choice but to get the tire replaced.
Trying to get the tire replaced proved challenging. Lots of phone calls between ourselves, our dealer, Newmar, Michelin, assorted Michelin dealers in Michigan and, finally, our roadside assistance service, Coach-Net. Coach-Net got the job done and covered the cost of sending a repair truck right to our campsite.
With a tire on the back of the truck, Steve, our tire repair guy, got ready to work. First, all of the power tools.
His first task was to position the tire jack. We did not have to pull our own jacks up and we did not have to bring our slides in. Nor did we have to unhook our services.
Steve made the job look easy, way too easy. That tire and wheel weighs in excess of 100 pounds or more.
For sure we would not get very far with this setup.
Steve deflated and then removed the original tire from the wheel and mounted the new tire on the wheel all within about 10 minutes. He was even thoughtful enough to inflate the new tire.
Then it was simply a matter of repositioning the wheel and making it secure.
And now we have a coach that we can drive again. I sure hope we don’t have another event on the I-75 going home. I may complain from time to time about the highways in Ontario but they are as smooth as glass when compared to sections of the I-75 in Michigan.
With the tire replaced, we can begin our journey back home. Bright and early tomorrow morning. Our first stop will be the Cummins dealer in Saginaw to get a software update for our Engine Control Module. From there, we will stopover at the Port Huron KOA before making our way home on Wednesday.
Leave a Reply
Want to join the discussion?Feel free to contribute!